Element NameStudyTiming
Parent ElementsStudyTimings
Element XPath(s)/ODM/Study/MetaDataVersion/Protocol/StudyTimings/StudyTiming
Element Textual ValueNone
Usage/Business Rules
  • Required
  • Cardinality: 1 or more
AttributesOID, Name
Child Elements(AbsoluteTimingConstraint*, RelativeTimingConstraint*, TransitionTimingConstraint*, DurationTimingConstraint*)

The StudyTiming element defines a timing constraint within the study, which can be an absolute timing constraint (e.g. start of the screening visit must be between 1 January 2022 and 31 December 2022),
a relative timing constraint (e.g. Visit 2 must be within 30 days after Visit 1 with a window of +/- 1 week), a transitiontiming constraint (timing constraint on a transition within a defined workflow),
or a duration timing constraint (e.g. the duration of Visit 2 is planned to take hours with a window of 30 minutes).