You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

The following is an example of a timing constraint on a transition defined in a workflow.

    <StudyTiming OID="ST.TIMINGS" Name="Study Timings">
        <TransitionTimingConstraint OID="TRTIM.MEAS_1_TO_2" Name="Time between measurement 1 and 2" TransitionOID="TR.MEAS_1_TO_MEAS_2"
            TimepointTarget="PT10M" TimepointPreWindow="PT1M" TimepointPostWindow="PT2M" Type="FinishToStart">
            <Description>
                <TranslatedText xml:lang="en">The time between measurement 1 and 2 ideally is 10 minutes, but is allowed to be between 9 and 12 minutes, 
					measured between the end of the first measurement and the start of the second measurement.</TranslatedText>
            </Description>
        </TransitionTimingConstraint>
    </StudyTiming>
    
    <WorkflowDef OID="WF.EXAMPLE" Name="Incomplete workflow example">
        <Transition OID="TR.MEAS_1_TO_MEAS_2" Name="Transition between measurement 1 and 2" SourceOID="IG.MEASUREMENT_1" TargetOID="IG.MEASUREMENT_2" />
    </WorkflowDef>
  • No labels