You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »


AttributeSchema Datatype or EnumerationUsageDefinitionBusiness Rules
OIDoidRequiredUnique identifier.
NamenameRequiredHuman readable name.
TransitionOIDoidrefRequired

References the workflow Transition on which the timing constraint must be executed.


TimepointTargetdurationDatetime

Conditional


The planned time between the two activities defined by the transition in the worfkflow,

Must be expressed as an ISO 8601 duration.

Either the TimepointTarget or the MethodOID must be provided - not both.

If the value is a "zero time duration", i.e. one of "P0D", "PT0H", "PT0S", the transition must be executed immediately, or within the provided time window, when provided.

MethodOIDoidrefConditionalReferences a MethodDef that returns a durationDatetime.  Use of a method allows  relative timings that depend on other pieces of information, or that are complex timing calculations.

Must match the OID attribute of a MethodDef element in this Study/MetaDataVersion.

The MethodSignature for the referenced MethodDef must identify the input parameters and a return value Dateype of durationDatetime.

If the returned value for the method is a "zero time duration" i.e. one of "P0D", "PT0H", "PT0S"the tranistion must be executed immediately, or within the provided time window, when provided.

Either the TimepointRelativeTarget or the MethodOID  must be provided - not both.

TimepointPreWindowdurationDatetimeOptionalSpecifies the amount of time prior to the TimepointTarget, the time between the two activities, may be shortened.Must be expressed as an ISO 8601 duration.
TimepointPostWindowdurationDatetimeOptionalSpecifies the amount of time after the TimepointTarget, the time between the two activities, may be lengthened.Must be expressed as an ISO 8601 duration.



  • No labels