The StudyTiming element defines a timing constraint within the study, which can be an absolute timing constraint (e.g., start of the screening visit must be between 1 January 2022 and 31 December 2022), a relative timing constraint (e.g., visit 2 must be within 30 days after visit 1 with a window of +/- 1 week), a transition timing constraint (i.e., timing constraint on a transition within a defined workflow), or a duration timing constraint (e.g., the duration of visit 2 is planned to take hours with a window of 30 minutes).
Element Name | StudyTiming |
---|---|
Parent Elements | StudyTimings |
Element XPath(s) | /ODM/Study/MetaDataVersion/Protocol/StudyTimings/StudyTiming |
Element Textual Value | None |
Attributes | OID, Name |
Child Elements | (AbsoluteTimingConstraint*, RelativeTimingConstraint*, RelativeTimingConstraint*, DurationTimingConstraint*) |
Usage/Business Rules |
Attribute | Schema Datatype or Enumeration | Usage | Definition | Business Rule(s) |
---|---|---|---|---|
OID | oid | Required | Unique identifier for a StudyTiming element. | The StudyTiming/@OID value must be unique within the study. |
Name | name | Required | Human readable identifier for a StudyTiming element. | The StudyTiming/@Name value must be unique within the study. |
Overview
Content Tools