Attribute | Schema Datatype or Enumeration | Usage | Definition | Business Rules |
---|---|---|---|---|
OID | oid | Required | Unique identifier. | |
Name | name | Required | Human readable name. | |
TransitionOID | oidref | Required | References the workflow Transition on which the timing constraint must be executed. | |
TimepointRelativeTarget | durationDatetime | Conditional | The planned time between the two activities defined by the transition in the worfkflow, | Must be expressed as an ISO 8601 duration. Either the TimepointRelativeTarget or the MethodOID must be provided - not both. |
MethodOID | oidref | Conditional | References a MethodDef that returns a durationDatetime. Use of a method allows relative timings that depend on other pieces of information, or that are complex timing calculations. | Must match the OID attribute of a MethodDef element in this Study/MetaDataVersion. The MethodSignature for the referenced MethodDef must identify the input parameters and return value type. Either the TimepointRelativeTarget or the MethodOID must be provided - not both. |
TimepointPreWindow | durationDatetime | Optional | Specifies the amount of time prior to the TimepointRelativeTarget, the relative time between the two activities, may be shortened. | Must be expressed as an ISO 8601 duration. |
TimepointPostWindow | durationDatetime | Optional | Specifies the amount of time after the TimepointRelativeTarget, the relative time between the two activities, may be lengthened. | Must be expressed as an ISO 8601 duration. |
Overview
Content Tools