Example | ||||||
---|---|---|---|---|---|---|
| ||||||
A study protocol's schedule of activities organizes activities within study epochs. This example shows a follow-up epoch with a planned duration of 3 weeks.
|
The PlannedDuration attribute provides the planned or expected duration of the epoch in ISO-8601 duration format. For epochs that have envisaged durations with time windows, the DurationTimingConstraint under StudyTiming will be used.