Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
  • Meets Acceptance criteria
  • When there is code, a PR is created and approved
  • It is tested
  • It is approved by Product Owner (Linda, Julie)


ActorActionAction description
Assigned to
Assignee of the PBI
Meets
  • The Assignee confirms the PBI meets the Acceptance criteria
The Assignee of the PBI confirms all changes are made in accordance with the acceptance criteria
Engineer
When
  • The engineer creates a PR when there is code
, a PR is created and approved

For a PBI that includes code, a PR will be created. If the PR is approved, it will be merged. 

The

PBI will be moved

status of the PBI is changed in ADO to "In Review"

status

by the assignee of the PBI for the next step.

Product owner / QC person
It is tested
  • The PO / QC person verifies the PBI

The Product owner or the QC person will test the PBI in the final environment and check that it includes all bullet points added to the acceptance criteria. This is the last step to look for anything that is still missing or is different from what was agreed upon when the PBI was approved.

If the result of the rest is not "OK", PBI will be sent back to the person that the PBI was assigned with the notes to be taken care of.

Product Owner
  • It is approved by Product Owner
The product owner
will mark
marks the PBI as "Done" in ADO when the PBI has followed the previous steps and passed each of them. 

Gliffy Diagram
displayNameDoD Flowchart
nameDoD Flowchart
pagePin4