...
The PlannedDuration attribute provides the planned or expected duration of the epoch in ISO-8601 duration format. For epochs that have envisaged durations with time windows, the DurationTimingConstraint under StudyTiming will be used.
Example | ||||||
---|---|---|---|---|---|---|
A study protocol Schedule of Activities will organize activites within study epochs.
|
...